Busy week so far with our first projects in the unit.
The major job with Dan’s car is coming along with the removal of standard VVC engine, rebuilding the cylinder head from the new engine, installing new forged piston bottom end, making all adaptations and installing super charger kit, oil cooler system, super charger separate oil feed system, charged cooler for the air flow. Replacing all rear sub-frame mounts, rear shockers, rear brakes etc ….more to do.
Whilst Jon did that
I cracked on with the TF 135 that we had bought with a trashed engine,
this was fitted with a new refurbished head, new thermostat, water pump,
tensioner, cambelt, alternator belt, underfloor stainless pipes, wire
brushed and under sealed, flexi hose removed & replaced. Soggy
carpet removed, still lots to do to this also to get her back to rights.
A tiring, but very interesting and satisfying week so far, back to it in the morning…